Part 1—General
SUBMITTAL
Submit color samples for selection from manufacturer’s
group A, B, C, D or E. Submit product literature, certifications,
test reports and full size sample(s) of each color specified.
QUALITY ASSURANCE
Certifications: All Trenwyth units contain an integral water repellent CMU admixture at the time of manufacture. Concrete
blocks for grinding shall conform to ASTM C90. The ground
surfaces shall have a factory-applied acrylic finish. Units
shall conform to ASTM C1262 with respect to freezing and thawing.
Trendstone units shall have a tighter, smoother
face. Mold and moisture resistant, Trendstone units are graffiti
resistant and easy to clean (never paint or refinish). No
VOC’s. Available in a wider color selection, custom
colors and unique shapes and sizes, these units are ideal
for interior and exterior applications. The structural integrity
of the unit results in a one-step, single trade installation
process. Trendstone units are distributed nationally.
Fire Resistance: Define
hourly ratings required by NCMA TEK Notes, available at www.trenwyth.com.
Field Constructed Mock-ups: Construct a sample panel, no less than 4' x 4', of
units of each color and size to be used in the project.
Trenwyth requires ordering a full size unit
to illustrate color and texture for approval. Trenwyth Industries
requires a sample panel be installed at the jobsite prior
to installation of any Trenwyth product. This panel will represent
both the quality of the product and the workmanship to be
expected for the project. The panel must be approved by either
the owner or architect for the project. Trenwyth will provide
4" units for a 4' by 4' sample panel at no cost for the
material (not including freight to site).
DELIVERY, STORAGE AND
HANDLING
Trendstone units shall be delivered to the jobsite
on covered banded pallets with cardboard between layers. Store
pallets in single stacks on level ground and cover with waterproof
covering (e.g., tarpaulins) to protect the blocks from inclement
weather. Handle blocks carefully to avoid breakage and damage
to the finished surfaces.
PROJECT/SITE CONDITIONS
Protection of Work: Cover
walls each day after installation to keep open walls protected
and dry. After units are installed they should be protected
from damage by other trades performing operations that can
stain or otherwise damage the finished surfaces by covering
walls with plastic. Corners should be protected from damage
after installation by covering them with plywood.
Part 2 – Products
PRODUCT NAME
Trendstone® ground face masonry units
MANUFACTURER
Trenwyth Industries (800) 233-1924
One Connelly Road
Emigsville, PA 17318
Trenwyth Industries (800) 358-3003
3400 E. Bungalow Road
Morris, IL 60450
Trenwyth Industries, (800) 331-9823
4626 N. 42nd Avenue
Phoenix, AZ 85019
RELATED MATERIALS
Colored matching or contrasting mortar is available
at Trenwyth Industries. Consult NCMA TEK Notes, available
at www.trenwyth.com, for mortar type and specifications. For
all exterior mortar, use matching Trenwyth-approved water
repellent mortar admixture following manufacturer's instructions.
Consult manufacturer for recommendations.
SIZES AND SHAPES
Surfaces are manufactured to provide finished dimensions
of 7-5/8" x 15-5/8" ± 1/8". Bed depth
dimensions for single face units are 3-9/16", 5-9/16",
7-9/16", 11-9/16" ± 1/8". Two face units
are 3-1/2", 5-1/2", 7-1/2", 11-1/2", ±
1/8". Nominal 2", 4", 6", 8", 10"
and 12" standard block thickness are available as well
as all standard block shapes. High-strength units for special
structural requirements, over-sized units, and metric shapes
and sizes are also available.
MASONRY CLEANERS
Use Burnished Custom Masonry Cleaner by PROSOCO carefully
following manufacturer's instructions (dilute 1 part to 3
parts clean water). Available at Trenwyth Industries. Do
not powerwash.
CAUTION! Never
use Muriatic Acid solution or any cleaner with an acid base
on units.
Part 3 – Execution
LAYING MASONRY WALLS
Draw blocks from more than one pallet at a time during
installation. All exterior mortar shall include Trenwyth-approved
matching water-repellent additive added to each batch in the
appropriate dosage rates for mortar type (M, S or N) per manufacturer's
instructions. Refer to NCMA TEK Notes, available at www.trenwyth.com,
for Hot and Cold weather construction practices.
Lay units using the best concrete masonry practices.
Install only quality units; reject all defective units as
defined by ASTM C90. Lay blocks with the faces level, plumb
and true to the line strung horizontally at the ground face.
Units shall have uniform, 3/8"-wide joints both horizontally
and vertically on the finished side of the wall. Tool joints
neatly after they are finger-hard to make them straight and
uniform. Size and place cut pieces appropriately to maintain
consistency and bond. Complete masonry construction using
procedures and workmanship consistent with the best masonry
practices.
INSTALLATION
Lighting: Provide adequate
lighting for masonry work by placing all lighting at a reasonable
distance from the wall for even illumination. Do not use trough
lighting.
Cutting: Make
all unit cuts, including those for bonding, holes, boxes,
etc., with motor-driven masonry saws, using either an abrasive
or diamond blade. Cut neatly and locate for best appearance.
MORTAR BEDDING AND JOINTING
- Lay units with full mortar coverage on head and bed joints
taking care not to block cores to be grouted or filled with
masonry insulation.
- Tool all mortar joints when thumbprint hard into a concave
configuration.
- Care should be taken to remove mortar from the face of
masonry units before it sets.
- Tuckpoint the joints of scored units for proper appearance.
All exterior scored units must be tuckpointed to prevent
water penetration. NO RAKE JOINTS.
FLASHING OF MASONRY WORK
Install flashing at locations shown in the plans and
in strict accordance with the details and the best masonry
flashing practices.
WEEP HOLES AND VENTS
Install weep holes and vents at proper intervals at
courses above grade and at any water stops over windows, doors
and beams. Consult NCMA TEK Notes, available at www.trenwyth.com,
for proper flashing and drawings.
INSPECTION
The ground faces shall conform to the requirements
of ASTM C90 when viewed from a distance of twenty (20) feet
at right angles to the wall with normal lighting.
CLEANING
Keep walls clean daily during installation using brushes,
rags and the burlap squares supplied on the pallets. Do not
allow excess mortar lumps or smears to harden on the finished
surfaces. Harsh cleaning methods after walls have been erected
will mar the surface of the blocks.
FINAL CLEANDOWN
Clean the completed walls with PROSOCO Burnished Custom
Masonry Cleaner (dilute 1 part to 3 parts clean water), strictly
following the manufacturer's instructions – including
thorough rinsing. Do not use acid or abrasives on the finished
surfaces. Failure to strictly follow manufacturer's instructions
can result in permanent damage to the finished faces. Do not
apply Burnished Custom Masonry Cleaner with pressure spray
above 50 psi. Do not powerwash.
FIELD COAT APPLICATION
For completely finished walls, a finish coat of TRENDCOAT®
Acrylic (minimum 20% solids content) or TRENDCOAT® WB
(water-base) is recommended. Apply to all Trendstone walls
after cleandown and when the walls are dry. Apply the acrylic
evenly to cover the entire surface without forming drips or
runs. For maximum coverage and best appearance, apply TRENDCOAT
Acrylic or TRENDCOAT WB with airless spray equipment. Consult
Trenwyth Industries for further information. This clear, high-solids
acrylic offers excellent graffiti resistance, provides moisture
resistance and helps to cover any scuffs or scratches that
may occur during handling and/or installation.
MAINTENANCE
Trendstone units, properly installed and cleaned, need
virtually no maintenance other than routine cleaning (i.e.
Pinesol or Fantastik). Graffiti, paint or dye stains may need
special cleaning methods and products such as Trenwyth's Graffiti
Wizard® environmentally friendly cleaner. Contact manufacturer
for specific cleaning recommendations.
INSTALLATION RECOMMENDATIONS
Consult NCMA TEK Notes, available at www.trenwyth.com,