INSTALLATION — Printable Version
IMPORTANT! Before
You Begin
Trenwyth requires that you order a full size
unit to illustrate color for approval. Trenwyth Industries
requires a sample panel be installed at the jobsite prior
to installation of any Trenwyth products. This panel will
represent the quality, color and texture of the product and
the workmanship to be expected for the project. Either the
owner or the project architect must approve the panel. Failure
to produce a sample panel may result in loss of warranty.
Trenwyth will provide 4" units for a 4' x 4' sample panel
at no cost for the material (not including freight to the
site).
Delivery, Storage and
Handling
Glazed masonry units shall be delivered to the jobsite
on banded pallets with individual protective covers on each
glazed block face. Keep protective block covers on the blocks
until installation. Store pallets in single stacks on level
ground and cover with waterproof covering (e.g., tarpaulins)
to protect the blocks from inclement weather. Handle blocks
carefully to avoid breakage and damage to the finished surface.
Project Site Conditions
Protection of Work: Cover walls, including open tops, each
day after installation to keep open walls protected and dry.
After units are installed they should be protected from damage
by other trades performing operations that can stain or otherwise
damage the finished surfaces by covering walls with plastic.
Corners should be protected from damage after installation
by covering them with plywood.
Do not, under any circumstance, install a damaged
unit that does not conform to the requirements of ASTM C90
and ASTM C744 for the block and glazed face respectively.
If units have been damaged during transit, contact Trenwyth
immediately.
Laying Masonry Walls
Draw blocks from more than one pallet at a time during installation.
All exterior mortar shall include Trenwyth-approved water
repellent additive added to each batch in the appropriate
dosage rates for mortar type (M, S or N) per the manufacturer’s
instructions. Refer to NCMA TEK Notes, available at www.trenwyth.com,
for Hot and Cold weather construction practices.
Lay Astra-Glaze-SW+ blocks with the faces level,
plumb and true to a line strung horizontally at the glazed
face. Install only quality units; reject all defective units,
as defined in ASTM C744. Units shall have uniform face joint
dimensions of 1/4"
both horizontally and vertically and 3/8" on the unglazed
side.
Tool joints neatly after they are finger-hard
to make them straight and uniform. Size and place cut pieces
appropriately to maintain consistency and bond. Complete masonry
construction using procedures and workmanship consistent with
the best masonry practices.
Lighting: Provide
adequate lighting for masonry work by placing all lighting
at a reasonable distance from the wall for even illumination. Do not use trough
lighting.
Base Course: Align
base course properly on the floor slab.
Cove Base: Keep
the cove base tight to the slab if vinyl floor tile is to
be installed. For thicker flooring, raise cove base units
to the desired height.
Cutting: Make
all unit cuts, including those for bonding, holes, boxes,
etc., with motor driven masonry saws, using either an abrasive
or diamond blade. Cut neatly and locate for best appearance.
Mortar Bedding and Jointing:
- Lay units with full mortar coverage on head and bed joints
taking care not to block cores to be grouted or filled with
masonry insulation.
- Tool all mortar joints when thumbprint hard into a concave
configuration.
- Care should be taken to remove mortar from the face of
masonry units before it sets.
- Tuckpoint the joints of scored units for proper appearance.
All exterior scored units must be tuckpointed to prevent
water penetration. Rake back the joint when epoxy (Bonsal/Laticrete)
is used on select jobs that require better moisture prevention.
Recommended Mortars
In all exterior mortar, we recommend using
the matching Trenwyth-approved water-repellent mortar additive (which may be purchased at Trenwyth Industries). Follow manufacturer's
instructions. Consult manufacturer for recommendations.
Cleaning During Construction
Keep walls clean daily during installation using brushes
or rags and a clean damp cloth. Harsh cleaning methods after
walls have been erected may mar the surface of the blocks.
Do not allow excess mortar lumps or smears to harden on the
glazed surfaces. Remove green mortar with a dry cloth. Do
not use steel wool, sandpaper or other abrasives.
Flashing of Masonry Work
Install flashing at locations shown in the plans and
in strict accordance with the details and the best masonry
flashing practices.
Weep Holes and Vents
Install weep holes and vents at proper intervals at
courses above grade, above flashing and at any water stops
over windows, doors and beams. Consult NCMA TEK Notes, available
at www.trenwyth.com, for additional information on flashing.
Inspection
The glazed facing shall conform to the requirements
of ASTM C744 when viewed from a distance of five (5) feet
at right angles to the wall with normal lighting. The concrete
masonry units on which the glaze is molded shall conform to
the requirements of ASTM C90.
Installation Recommendations
- For walls with a glazed finish on both sides, use two
single-faced units. Because masonry units are typically
installed aligning one side, the second side of double faced
units is almost invariably misaligned. Use double-faced
units only when economy is more important than appearance.
Trenwyth accepts no responsibility for face alignment.
- Cavity wall construction is recommended for exterior
walls, with proper flashing, venting and weep holes.
- For best appearance, use stack bond construction when
stack bond appearance is desired (as opposed to scored units
in running bond).
- All exterior mortar joints must contain an approved water
repellent additive. In all exterior mortar, we recommend
using the matching Trenwyth-approved water-repellent mortar
additive (which may be purchased at Trenwyth Industries).
Follow manufacturer's instructions. Consult manufacturer
for recommendations.
- For best appearance and water resistance, tuckpoint scored
joints on interior and exterior applications.
- A complementary or matching mortar color is recommended
when using colorful
Astra-Glaze-SW+ units.
Grouting Walls Solid
When filling walls with grout, proper detailing to
remove moisture is even more critical. Follow masonry best
practices and manufacturer’s recommendations for the
installation of weep holes, vents and flashing.
Special Shapes and Colors
- Two different colors on one block. Any
color can be put on one side of the block. And the same
or any other color can be put on the other side of the same
block.
- No double bullnose units. Double bullnose
units are not available because they cannot be drawn out
of the molds. The molding methods will not accommodate double
bullnose units on full-sized blocks. Some double bullnose
Astra-Glaze-SW+ units are available in our 1" and 2"
Shapes Series.
Joint Size
The proper joint size to use when laying Astra-Glaze-SW+
block is 1/4" at the face and 3/8" at the unglazed
concrete blocking.
The glazed face dimensions are 7 3/4" x 15 3/4",
which allows a 1/4" joint using modular coursing.

Installed With Other CMU Products
Alignment
If the face of a masonry wall involves different masonry
products, it is necessary for the foreman to know the exact
dimensions of each of the products to be installed in order
to properly make bond when preparing the layout.
If the joint requirement for one of the products is 1/4"
and the other is 3/8", this point must be taken into
consideration when laying out the first course. If it’s
not taken into consideration, the resulting finished wall
will have unsightly misaligned vertical joints.
Example:
Astra-Glaze-SW+ units are specified in the wainscot
of a corridor with Verastone, Verastone Plus, Trendstone or
Trendstone Plus blocks above that point. Units have a single
center score and the wall is in running bond.
The difficulty in holding a correct running bond is due to
aligning the 3/8" joints of the Verastone, Verastone
Plus, Trendstone or Trendstone Plus units properly over the
1/4" joints of Astra-Glaze-SW+.
Astra-Glaze-SW+ units must be laid using face joints of 1/4"
both vertically and horizontally. The Verastone, Verastone
Plus, Trendstone or Trendstone Plus units being laid above
must be centered over the 1/4" joint of the Astra-Glaze-SW+
units which are already in place.
Depth Alignment
Astra-Glaze-SW+ units are 1/8" wider than standard
CMU’s. Astra-Glaze-SW+ double-faced units are 1/4"
wider than standard CMU’s. This must be taken into consideration
in partition and double-faced walls that combine glazed units
with other products.
The small ledge created by Astra-Glaze-SW+ blocks combined
with other products is actually very attractive. When the
mason lays the walls so that the glazed surface protrudes
very slightly beyond the CMU above, it can actually enhance
the overall appearance.
An alternative option is to use a 2" glazed unit and
a standard-weight block backup. This enables the mason to
maintain the same depth of material if desired (see Depth
Alignment) and guards against moisture retention in the lightweight
Astra-Glaze-SW+ block substrate.
PLEASE NOTE: A matching Trenwyth-approved water repellant
mortar additive must be added to the mortar and built into
the adjoining blocks in all such exterior applications of
Astra-Glaze-SW+ units.
|